Planning a kitchen extension: what to decide first

By James Williamson, Architect & Director

A long run of grey painted kitchen units with a butler sink, beside full-height sliding glass doors onto a brick-walled courtyard.

Most people who ask me about planning a kitchen extension start with the same sentence: “The kitchen just doesn’t work.” Then they describe the mornings. Two people trying to make breakfast in a galley. A dining table nobody sits at because it is in the wrong room. A back door you can only reach by walking through the cooking.

What they rarely start with is size. And yet the first thing most people do is ask a builder how much it costs to push the back wall out four metres.

Three things come before that: the brief, the permissions and the money. The order you take them in matters as much as the answers. The design process itself, step by step, is in designing a kitchen extension that works.

What should you decide first?

Before anyone draws anything, write down what is actually wrong. Not the kitchen from a magazine, but the specific things that annoy you every day. Too little worktop beside the hob. No daylight in the dining area after three in the afternoon. Homework spread across the only surface you can cook on. No view of the garden from the sink, so you can’t see the children.

That list is the brief, and it decides everything else. It is also, surprisingly often, a list that can be fixed partly or completely inside the walls you already have: the kitchen moved into the dining room, a wall taken out, the utility moved into a side passage. Sometimes an extension is still the right answer. Sometimes it is half the size people first assumed. The Guildford kitchen and ground floor renovation was that kind of answer: a smaller scheme than every builder had proposed, because the problem was the flow through the house, not its size.

Once you know what the room has to fix, decide in this order: layout, then light, then finishes. Where the sink, hob, fridge and table go, and how you get from the front door to the garden, comes first. Rooflights and glazing follow the layout, because a rooflight is only useful over the part of the room that needs it. Worktops, flooring and handles come last. They need a budget figure from the start, but they don’t need choosing in month one.

A dark blue kitchen with brass handles, a walnut island with a gas hob and a globe pendant light overhead.

Kitchen extension ideas by house type

Surrey has a few house types that come up again and again, and each has its own familiar answer.

Victorian and Edwardian terraces. The kitchen sits in a narrow back addition, with a side return beside it that gets used for bins. Infilling the side return, with glazing or a rooflight along the line of the old wall, turns a corridor kitchen into a room wide enough for a table. The middle room is the one to watch: it can lose its only window, so the rooflight position matters more than the size of the doors.

1930s semis. A good front room, a small kitchen at the back and a poor link to the garden. A single-storey rear extension across the width, with the kitchen moved to the back next to the garden, is often the single biggest improvement. The front room usually stays as a sitting room you can close the door on.

Bungalows. Low ceilings and small rooms are the problem more often than floor area. Vaulting the ceilings into the roof space can change the feel of the house before anything is added. On the Reading bungalow, an outdated conservatory was replaced with a modest rear extension, with long rooflights marking where new meets old and an open kitchen, dining and living area below.

Detached houses with an awkward earlier extension. Sometimes the best idea is to take something away. In East Molesey, a Martin Swatton Design scheme for which we produced the technical drawings, a poorly built extension had a heavy column cutting the kitchen in two. The structure was stripped back, new steels were set within the depth of the floor so the ceiling is flat, and a new rear extension gave the family one bright room onto the garden. Where a house has space at the side and the back, a wraparound extension is another route.

The ideas that cost least

Moving the kitchen, not the walls. The kitchen often sits in the darkest room because that is where it was put when the house was built. Swapping kitchen and dining room can do more than an extension, though the drainage, the extractor and the electrics move with it, so they are worth checking before you fall for the idea.

A utility or boot room. Washing, coats, shoes and the recycling all end up in the kitchen when they have nowhere else to go. A small room by the back door takes a surprising amount of pressure off.

Broken plan instead of fully open. A wide opening with a pair of glazed doors, so the kitchen and sitting room are one room on a Saturday and two on a weeknight. There is more on this in open-plan living: what works and what to avoid.

Do you need planning permission for a kitchen extension?

Not always. Many single-storey rear extensions in England can be built under permitted development, the national rights that allow some work without a planning application. The main limits for a single-storey rear extension are:

  • no deeper than 3 metres beyond the original rear wall of a semi or terrace, or 4 metres for a detached house
  • no higher than 4 metres, and no higher than 3 metres at the eaves if it is within 2 metres of a boundary
  • materials similar in appearance to the house
  • together with other extensions and outbuildings, covering no more than half the land around the original house

“Original” means the house as it was first built, or as it stood on 1 July 1948, so an earlier extension counts against the allowance. There is also a larger home extension route, up to 6 metres for a semi or terrace and 8 metres for a detached house, where the council notifies the neighbours and checks the effect on them before you build.

Those rights are narrower in conservation areas, National Landscapes such as the Surrey Hills, and other protected land. There, side extensions and rear extensions of more than one storey are not permitted development, cladding is not allowed, and the larger home extension route is not available. Some councils have removed rights altogether on particular streets or estates with an Article 4 direction. On a listed building, listed building consent is needed for almost any extension, whatever the planning position.

If your scheme does fit, a lawful development certificate is the council’s written confirmation that it is permitted. It is sensible to have one before you build, and your buyer’s solicitor will usually ask for it when you sell. If it doesn’t fit, a householder planning application is the route, and councils usually decide those 8 to 12 weeks after validation. There is more on choosing between the two in permitted development vs planning permission.

What about building regulations and party walls?

Building regulations apply whichever planning route you take. They cover the structure, insulation, drainage, ventilation and fire safety, and they are checked by building control, not the planning department. A kitchen extension usually needs a full plans application, because there is steel, a new roof and often new drainage. Planning permission vs building regulations explains the difference.

If the work touches a wall you share with a neighbour, or digs foundations close to theirs, the Party Wall etc. Act 1996 will probably apply. Notices need serving well before the builder starts, and that is a job for a party wall surveyor, not a conversation over the fence. If a public sewer runs under the new floor, the water company will need a build-over agreement too.

What does a kitchen extension cost in Surrey?

I wouldn’t give anyone a figure for their kitchen extension without seeing the house. What I can give is the published Surrey benchmark: building work for an extension typically runs at £2,500–£3,500 per m² of new floor area, before VAT. Specification, site conditions and a contingency of 10–15% all move that number, and on an older house the contingency is not optional. It is a range, not a quote.

The kitchen itself sits on top. As a guide, VAT included, a standard kitchen supplied and fitted is around £10,000–£20,000, a good one £20,000–£40,000, and the top end starts from £40,000. Most building work on an existing house carries VAT at 20%, so always ask whether a figure includes it. The extension cost calculator puts those figures together for your own size and specification.

What pushes a kitchen extension towards the top of the range is usually structural, not decorative. Steel to open up the back wall. A long run of sliding doors. Rooflights. Drainage that has to move because the new kitchen sits over a manhole. Those decisions belong at layout stage, because that is when they are cheap to change.

How long does it take?

Longer than most people expect. A measured survey takes a week or two. Design takes weeks, not days. If a planning application is needed, allow 8 to 12 weeks for the decision. Then come the technical drawings, building control and getting builders’ prices. For a whole project, from the first call to moving back in, 12 to 18 months is realistic. Most of that is the thinking, and the thinking is what keeps the build itself calm.

The order that saves money

On a kitchen extension the usual order is a builder’s quote first, a design second and a brief never. The sensible order is the reverse. Work out what the room has to fix. Test two or three layouts against that list, including at least one that doesn’t extend at all. Put a cost band and a planning route against each. Then decide.

That is the job of the Clarity Pack. How the later stages run, from design to the build, is set out on the kitchen extensions page.

If you’re at the stage of wondering where to start, the free 15-minute Clarity Call is a good first step.

Questions people ask about kitchen extensions

How big should a kitchen extension be? Often smaller than people first assume. Start with the list of what the kitchen gets wrong and test two or three layouts against it, including one that does not extend at all. Depth also sets the planning route: up to 3 metres on a semi or terrace, or 4 metres on a detached house, a single-storey rear extension can usually be permitted development, and the larger home extension route runs to 6 and 8 metres with the neighbours consulted. On a terrace, going deeper can leave the middle room dark.

Do I need a party wall agreement for a kitchen extension? Often, yes. If the new structure touches a wall you share with a neighbour, or the foundations are dug close to theirs, the Party Wall etc. Act 1996 will probably apply. Notices have to be served well before the builder starts, and the notice periods allowed to run, so it belongs in the programme rather than in a conversation over the fence. A party wall surveyor handles the notices and, if the neighbour does not consent in writing, the award that follows.

Where should the kitchen go in a kitchen extension? Next to the garden, more often than not, with a view of it from the sink. In many Surrey houses the kitchen sits in the darkest room because that is where it was put when the house was built, and moving it to the back, or swapping it with the dining room, can do more than adding floor area. Drainage, the extractor and the electrics move with it, so check those before you fall for the idea. Rooflights then go over the part of the room that needs the light.

Journal by email

New articles, sent to you

New posts, a few times a month. No fees, no selling. Unsubscribe in one click.

We use your details only to send you the journal, as described in our privacy policy, and never share them.

The service this relates to

The cover photograph of Your Dream Home: a bright kitchen extension in Walthamstow

Free guide

Your Dream Home

Doing this for the first time? Thirty-eight pages on getting the order right: the five mistakes to avoid, what it really costs in Surrey, how planning works and how long it takes, with two worksheets to fill in.

Get the free guide

If you are weighing this up for your own home

Fifteen minutes on the phone with James. There is no pressure and no obligation. Sometimes the right outcome of a call is simply a clearer head.

Book a free 15-minute Clarity Call (opens in a new tab)

James calls you at the time you pick. You describe the house and what you want to do; he tells you what he would do first and whether a Clarity Pack is worth it. No preparation needed.

No selling. Just a clear view on the smartest next step. Prefer to write? Send a short note.

Accreditations

  • RIBA Chartered Practice
  • ARB registered architect, registration number 088216J
  • AECB member
  • Passivhaus Trust member
  • LABC Registered Partner, Partner Authority Scheme
  • Woking Chamber of Commerce member

Enlarged picture