7 renovation budget mistakes Surrey homeowners make before they start

By James Williamson, Architect & Director

A dark blue kitchen with brass handles, open shelving lit by brass wall lights, and a walnut island with a gas hob.

When a renovation goes over budget, people tend to blame the build. The builder found something, prices went up, the job took longer. Sometimes that is true. But most renovation budget mistakes are made months earlier, before anyone is on site.

The good news is that the early mistakes are predictable. These are the seven I see most often with Surrey homeowners, and what to do instead.

1. Starting from someone else’s number

A figure from a website, a friend’s project, a builder’s guess on the doorstep. Each of those was an answer to a different question: a different house, different ground, a different specification, a different year.

Start instead from the published Surrey benchmark, £2,500 to £3,500 per square metre of new floor area for extension building work, before VAT, and then adjust for your house. Specification, site conditions and contingency all move that number. How much an extension costs in Surrey sets out the benchmark alongside real figures from our own tenders.

2. Forgetting the layers around the building work

VAT at 20% applies to most work on an existing house. Then there are the architect, the structural engineer, the measured survey, building control and planning fees, party wall surveyors if the work affects a shared wall, and often a drainage or tree survey. The kitchen and bathrooms are frequently priced separately from the build.

And the existing house usually needs work too. One of our own recent tenders was a small single-storey extension with a rewire, new heating and redecoration, and it came in at £125,000 to £135,000 (2025 to 2026, excluding VAT, rounded). The extension was only part of that. What to include in an extension budget goes through every layer.

3. Having no contingency, or one in name only

Older houses hide things: wiring past its life, joists that have rotted where they meet a damp wall, drains that are not where anyone thought. Set aside 10 to 15% on top of the building cost and keep it for those surprises, not for upgrading the worktops halfway through.

4. Designing before testing the budget

The usual pattern is that someone draws the scheme everyone hopes for, it goes out to price, and the quotes come back well over. Then the design is cut back in a hurry, and the cuts fall on whatever is easiest to remove, which is rarely the least important thing.

It is much better to put rough costs against two or three options at the very start, so the budget shapes the design and not the other way round.

5. Comparing builders’ quotes that don’t price the same thing

If the drawings are thin, each builder fills the gaps with their own assumptions. One includes the steelwork, one puts in a provisional sum, one leaves it out. The cheapest quote is often the one with the most left out, and the difference reappears as extras on site.

Full technical drawings and a written specification let every builder price the same job, so the comparison means something. Finding a good builder in Surrey explains how a proper tender works.

6. Deciding late

Every change once building has started has a cost: materials reordered, trades rescheduled, work taken out and done again. There are a handful of points on site where the build waits for you, such as before the electrics and plumbing go in, and before the walls are closed up.

Socket positions, lighting, the kitchen layout and the bathroom fittings all need settling before the relevant one arrives. Seeing the rooms in 3D before you build makes those decisions far easier to make early.

7. Spending in the wrong places

People will cut insulation to afford a bigger sliding door, or move the kitchen to the other side of the house without realising the drainage has to follow it.

It’s not really about design. It’s really about what order decisions should happen in. Get the structure, the drainage, the fabric and the layout right first, because those are expensive or impossible to change later. Finishes can be upgraded in five years. Foundations cannot.

What does this look like on a real project?

The rear of a renovated bungalow in Woking, with a timber-clad pitched roof over a fully glazed living space opening onto a lawn.

A 1970s bungalow in Woking. James led this project while at Lees Munday Architects.

A project like the 1970s bungalow in Woking above, replanned and extended at the back, involves dozens of decisions with real money attached. The expensive ones are structural: where the steel goes, how a new roof meets the old one, how wide the opening to the garden can be. They have to be settled first, and the finishes follow.

How do you stop a renovation going over budget?

Start with a short list of questions before anything is drawn. What is wrong with the house as it stands? What is the most you are prepared to spend, including VAT, fees and contingency? What would you do if the figure came back higher than that? Is there a version of the project that does less but fixes the main problem?

That last one is often the most useful. Many projects can be phased: the kitchen and the rewiring now, the loft in a few years, with the structure and services planned so the second phase does not undo the first. There is more on where savings are safe in renovating on a budget.

Testing those questions against your own house, with cost bands for each option, is what the Clarity Pack is for. If you would like to talk it through first, the free 15-minute Clarity Call is a good place to start.

Questions people ask about renovation budgets

How much contingency do I need for a renovation? Set aside 10 to 15% on top of the building cost, and lean towards the top of that on an older house. Wiring past its life, rotten joist ends and drains that are not where anyone thought all turn up once the floors are open. The contingency is for those surprises. If it gets spent on upgrading the worktops halfway through, it is not a contingency any more, it is just a bigger budget.

Do I pay VAT on a renovation? On most work to an existing house, yes, at 20%, and it is the layer people forget most often. The architect, structural engineer, measured survey, building control and planning fees, and any party wall surveyors sit on top of the building cost too, and the kitchen and bathrooms are frequently priced separately from the build. Write the budget down with all of those layers in it before you fall for a scheme.

Why are builders’ quotes so different from each other? Usually because they are not pricing the same thing. When the drawings are thin, each builder fills the gaps with their own assumptions: one includes the steelwork, one puts in a provisional sum, one leaves it out. The lowest quote is often the one with the most missing, and the gap comes back as extras once work has started. Full technical drawings and a written specification are what make quotes comparable.

Journal by email

New articles, sent to you

New posts, a few times a month. No fees, no selling. Unsubscribe in one click.

We use your details only to send you the journal, as described in our privacy policy, and never share them.

The service this relates to

The cover photograph of Your Dream Home: a bright kitchen extension in Walthamstow

Free guide

Your Dream Home

Doing this for the first time? Thirty-eight pages on getting the order right: the five mistakes to avoid, what it really costs in Surrey, how planning works and how long it takes, with two worksheets to fill in.

Get the free guide

If you are weighing this up for your own home

Fifteen minutes on the phone with James. There is no pressure and no obligation. Sometimes the right outcome of a call is simply a clearer head.

Book a free 15-minute Clarity Call (opens in a new tab)

James calls you at the time you pick. You describe the house and what you want to do; he tells you what he would do first and whether a Clarity Pack is worth it. No preparation needed.

No selling. Just a clear view on the smartest next step. Prefer to write? Send a short note.

Accreditations

  • RIBA Chartered Practice
  • ARB registered architect, registration number 088216J
  • AECB member
  • Passivhaus Trust member
  • LABC Registered Partner, Partner Authority Scheme
  • Woking Chamber of Commerce member

Enlarged picture