“Is our budget realistic?” It is the question we hear more than any other on a first call, usually followed by a figure, and very often that figure is £200,000. Sometimes it comes with a nervous laugh and “or are we in cloud cuckoo land?”. So is £200k enough for an extension in Surrey? Often, yes. But not always for the extension people have in mind, and the gap is nearly always in the same places.
What the building work costs
As a Surrey benchmark, the building work for an extension typically costs £2,500 to £3,500 per square metre of new floor area, before VAT. Specification, site conditions and how much of the existing house is touched move a project within that band. A 25 m² single-storey rear extension, for example, comes to £62,500 to £87,500 of building work on its own.
That number is real, and it is where most people stop counting. It is the middle of the budget, not the whole of it.
What sits around it
Four things sit on top of the building work, and together they are why a figure that looked comfortable starts to feel tight.
VAT. Most building work on an existing house carries VAT at 20%. If your £200,000 is everything you have, it has to cover the VAT too, so the building work itself is working with roughly a sixth less than the headline figure.
The kitchen and bathrooms. These are often priced separately from the build. A good kitchen is typically £20,000 to £40,000 and a standard bathroom £4,500 to £9,000. People rarely leave these out on purpose. They leave them out because the builder’s quote did.
Contingency. Allow 10 to 15% of the building work for what you cannot see until the walls are open: an old drain under the footprint, deeper foundations near trees, a beam that is not where the drawings said.
Fees and surveys. The structural engineer, building control, the planning fee, a measured survey and our own fees. None of them is large on its own, and together they add up.
So what does £200k actually buy?
Our own recent tenders give a feel for it. Excluding VAT, a small single-storey extension with a rewire, new heating and redecoration came in at £125,000 to £135,000. A single-storey extension with a loft conversion and a refurbishment came to about £230,000.
So £200,000 including VAT will usually stretch to a well-specified single-storey extension and the work it sets off in the rooms next to it. It usually will not stretch to an extension, a loft and a whole-house refurbishment at once. That is not bad news. It is the decision you need to make early, before anyone draws the version you cannot afford.
Where budgets actually go wrong
In our experience a budget rarely fails because the figure was too low. It fails because decisions were made in the wrong order. The extension gets drawn at the size people hoped for, planning is granted, and only then does a builder’s price arrive that is well over. By that point the drawings, the planning fee and months of time have gone into a scheme that has to be cut back.
The fix is simple to describe. Test the budget against the brief before anything is drawn properly. Decide what has to happen now, what can wait for a second phase, and what you would give up first if the numbers come back high. Then draw the scheme that fits.
How to find out before you spend
That first step is what our Clarity Pack is for. We look at your house, what you want from it and the budget you have, and come back with layout options, what each is likely to cost and what has to happen first. At the end you have a clear go or no-go, with numbers, before you commit to planning drawings or a builder.
If you would like a first view on whether your figure is realistic, a free 15-minute Clarity Call is the place to start. You can also put your own figure into the budget tool first: add your budget and it tells you whether it sits above the range, inside it or below it.
Questions people ask about whether £200k is enough
Does my £200k budget include VAT? It should, if it is the total you can spend. Most building work on an existing house carries VAT at 20%, so a budget that leaves VAT out will be short by about a sixth once the builder’s invoices arrive.
How much contingency should I keep back? Allow 10 to 15% of the building work. Older houses, clay soils near trees and projects that open up existing walls sit at the top of that range.
Can I phase the work to make the budget go further? Often, yes. A common route is to get planning for the whole scheme, build the part that matters most now, and leave the loft or the second phase for later. The order needs deciding before the first phase is drawn, so the later work does not mean undoing the earlier one.