Projects · High Weald, Sussex
Sussex timber-framed house renovation
A timber-framed house with long views over the High Weald, opened up for light, open-plan living without losing its character.
The problem
They wanted to open the house up for light, open-plan living without losing its character or its connection to the countryside around it.
The decisions
- Vault the main room and join the rest.
- Shade the glass.
- Get permission for the whole plan.
- Meet the budget, run the contract.
The result
The house keeps its timber-framed character, and it now has the light, the openness and the comfort the owners were looking for when they bought it.
The owners bought this timber-framed house in Sussex, a Colt House, as their long-term home. They were drawn by its raised position and its wide views over the High Weald Area of Outstanding Natural Beauty. They wanted to open the house up for light, open-plan living without losing its character or its connection to the countryside around it.
Two things shaped every decision: the timber frame and the setting. Changes had to work with the existing structure, and anything new had to sit quietly in a protected area.
Inside, the main living space was vaulted, and the kitchen, dining and entertaining areas were joined into one. Large areas of glazing frame the views. To stop all that glass overheating the rooms, external solar shading was added, alongside better insulation and energy-efficient systems intended to make the house more comfortable and to reduce its running costs.
Outside, extensive decking and terraced gardens make room for outdoor living and exercise. Existing trees were kept and native planting added, so the house stays rooted in its setting.
The planning permission also covers a new garage, which has not been built yet. Because it was approved together with the work to the house, and that work has started, the garage can be built whenever the owners are ready and is not tied to the usual three-year limit. It is why we encourage clients to think about the whole plan for the house at the start, even if it is built in stages.
We worked on the project from concept design through to completion, cutting the scope to meet the budget after the first tenders, then running the building contract and supervising the work on site. The photographs on this page were taken on our visits as the house was finished; the visualisations further down show the scheme as we designed it, and the built house is close to them.
The house keeps its timber-framed character, and it now has the light, the openness and the comfort the owners were looking for when they bought it.
The decisions
Vault the main room and join the rest. We vaulted the main living space and joined the kitchen, dining and entertaining areas into one, working with the existing timber frame.
Shade the glass. Large areas of glazing frame the views, with external solar shading to stop the rooms overheating.
Get permission for the whole plan. In a protected landscape, one approval covers the work to the house and a garage, not yet built, which can follow whenever the owners are ready.
Meet the budget, run the contract. We tendered the job and, after the first tenders came back, cut the scope to meet the budget. We then set up the building contract and ran it, with site meetings from the start on site in March 2024 until Building Control signed the work off that October.
Before and after
Drag the line to compare
After
Before









Related reading
Worth reading